PACE PEOPLE LTD

No items found.

The main tasks of the company:

  • Training of employees on the inspection and production of electricity on Nordex Delta 3000 wind turbines;
  • Conducting electrical tests of the electrical infrastructure, as well as WTG, ensuring their compliance with the Nordex technical requirements notified to them;
  • Control over the installation of WTG (Nordex Delta 3000 wind turbine generator) in accordance with the installation instructions and safety instructions;
  • Conducting an independent analysis of malfunctions and troubleshooting of mechanical and electrical devices at the commissioning stage (with repair and/or replacement if necessary);
  • Completion of the necessary safety tests and ensuring the correct operation of the WTG safety systems;
  • Recruitment of employees to perform qualified functions of safe mechanical installation, commissioning and functional testing of components of wind turbine generators (WTG) and related equipment.

Area:

Size:

Equipment:

Category:

Syvash Wind Power Plant

Client:

PACE PEOPLE LTD

Year:

2021

Location:

Related projects